-
Notifications
You must be signed in to change notification settings - Fork 25
Open
0 / 10 of 1 issue completedLabels
Final stretchItems that are specifically listed in our plans through the end of CEMeNTItems that are specifically listed in our plans through the end of CEMeNT
Description
From the 05/07/2025 document "MC/DC Plans Through the End of CEMeNT" :
The plan is to add more continuous energy physics (by referring to OpenMC) and prepare the ACE-based data library using ACETk. Initial validation results (ICSBEP and pulsed sphere experiment) suggests that fast neutron reaction physics implementations need to be prioritized. For work efficiency, using an LLM to convert OpenMC C++ functions into Python as an initial draft is considered.
Sub-issues
Metadata
Metadata
Assignees
Labels
Final stretchItems that are specifically listed in our plans through the end of CEMeNTItems that are specifically listed in our plans through the end of CEMeNT