-
Notifications
You must be signed in to change notification settings - Fork 5
Closed
Labels
Art 20(4)CAB accreditationCAB accreditationArt 5cCertification of the European Digital Identity WalletsCertification of the European Digital Identity WalletsCIR (EU)This STS is referenced in a CIR (EU)This STS is referenced in a CIR (EU)CIR (EU) 2024/2981Certification of Wallet Solutions - https://data.europa.eu/eli/reg_impl/2024/2981/ojCertification of Wallet Solutions - https://data.europa.eu/eli/reg_impl/2024/2981/ojsts: cross milestoneDescribes a standard with gap affecting more than one milestonesDescribes a standard with gap affecting more than one milestonessts: needs follow upThe standard needs follow up due to a forthcoming updated versionThe standard needs follow up due to a forthcoming updated versionsts: readyThe standard has a stable version publishedThe standard has a stable version published
Milestone
Description
Formal name
ISO/IEC 17025:2017 General requirements for the competence of testing and calibration laboratories
Overview
This standard is relevant both for Article 5c(6) in IAs Batch 1 and for Article 20(4) in Batch 4.
Work Plan
At this point this standard is marked as fulfils
. If it will be found to have some gaps related to Article 20(4), this ticket will be updated accordingly.
Tasks
- Follow up on future assessment regarding Article 20(4).
Alerts
There are no open alerts.
References
Metadata
Metadata
Assignees
Labels
Art 20(4)CAB accreditationCAB accreditationArt 5cCertification of the European Digital Identity WalletsCertification of the European Digital Identity WalletsCIR (EU)This STS is referenced in a CIR (EU)This STS is referenced in a CIR (EU)CIR (EU) 2024/2981Certification of Wallet Solutions - https://data.europa.eu/eli/reg_impl/2024/2981/ojCertification of Wallet Solutions - https://data.europa.eu/eli/reg_impl/2024/2981/ojsts: cross milestoneDescribes a standard with gap affecting more than one milestonesDescribes a standard with gap affecting more than one milestonessts: needs follow upThe standard needs follow up due to a forthcoming updated versionThe standard needs follow up due to a forthcoming updated versionsts: readyThe standard has a stable version publishedThe standard has a stable version published
Type
Projects
Status
✅ Done