Merge branch 'mr/cardao/fix-maven-download-call' into 'master' #918
ci.yaml
on: push
security
33s
pre-commit
16s
Matrix: build
Annotations
9 errors
build (ubuntu-latest, 3.11)
Process completed with exit code 1.
|
build (ubuntu-latest, 3.9)
The operation was canceled.
|
build (ubuntu-latest, 3.9)
The strategy configuration was canceled because "build.ubuntu-latest_3_11" failed
|
build (windows-latest, 3.12)
The operation was canceled.
|
build (windows-latest, 3.12)
The strategy configuration was canceled because "build.ubuntu-latest_3_11" failed
|
build (ubuntu-latest, 3.10)
The operation was canceled.
|
build (ubuntu-latest, 3.10)
The strategy configuration was canceled because "build.ubuntu-latest_3_11" failed
|
build (ubuntu-latest, 3.12)
The operation was canceled.
|
build (ubuntu-latest, 3.12)
The strategy configuration was canceled because "build.ubuntu-latest_3_11" failed
|