-
Notifications
You must be signed in to change notification settings - Fork 2
Design documents
eleksi edited this page Feb 9, 2023
·
1 revision
User Story Map | Timetables (Google Draw)
User Story Map | Routes and lines (Google Draw)
- JORE users, teams and responsibilities
Main concept wireframes (Figma)
- Structure, main views, some subpages. Edited after user interviews 03/2021
- Work in progress
Usage paths, early work (Figma)
- Updating a permanent route
- (December 2021)
Network and routes 1.0 (Figma)
- (September 2021, incl. list views)
Network and routes 0.5 (Figma)
User evaluation results 12/21 (Figma)
- Timetables | Main findings
User evaluation results 09/21 (Figma)
- Routes and Lines | Main findings and proposals
User evaluation results | All (Drive folder)
- Slide presentation
- Google sheet of suggestions to dicuss and prioritise