Skip to content

Merge pull request #3 from REChain-Network-Solutions/dependabot/npm_a… #14

Merge pull request #3 from REChain-Network-Solutions/dependabot/npm_a…

Merge pull request #3 from REChain-Network-Solutions/dependabot/npm_a… #14

Triggered via push July 4, 2025 04:34
Status Failure
Total duration 14s
Artifacts

npm-grunt.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (20.x)
Process completed with exit code 1.
build (22.x)
The operation was canceled.
build (22.x)
The strategy configuration was canceled because "build._20_x" failed
build (18.x)
The operation was canceled.
build (18.x)
The strategy configuration was canceled because "build._20_x" failed