Skip to content

Merge pull request #17 from REChain-Network-Solutions/dependabot/npm_… #45

Merge pull request #17 from REChain-Network-Solutions/dependabot/npm_…

Merge pull request #17 from REChain-Network-Solutions/dependabot/npm_… #45

Triggered via push August 5, 2025 05:03
Status Failure
Total duration 13s
Artifacts

npm-grunt.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (22.x)
Process completed with exit code 1.
build (20.x)
Process completed with exit code 1.
build (20.x)
The strategy configuration was canceled because "build._22_x" failed
build (18.x)
The operation was canceled.
build (18.x)
The strategy configuration was canceled because "build._22_x" failed