chore(deps): update dependency semantic-release-preconfigured-conventional-commits to v1.1.140 #5403
build-and-deploy.yml
on: pull_request
Annotations
11 errors
build (ubuntu, 17)
Process completed with exit code 1.
|
build (macos, 17)
The strategy configuration was canceled because "build.ubuntu_17" failed
|
build (windows, 11)
The operation was canceled.
|
build (windows, 11)
The strategy configuration was canceled because "build.ubuntu_17" failed
|
build (windows, 17)
The operation was canceled.
|
build (windows, 17)
The strategy configuration was canceled because "build.ubuntu_17" failed
|
build (macos, 11)
The operation was canceled.
|
build (macos, 11)
The strategy configuration was canceled because "build.ubuntu_17" failed
|
build (ubuntu, 11)
The operation was canceled.
|
build (ubuntu, 11)
The strategy configuration was canceled because "build.ubuntu_17" failed
|
success
Process completed with exit code 1.
|