chore(deps): update all non-major dependencies #891
test.yaml
on: pull_request
Matrix: Unit test
Formatting check
1m 33s
Test docs
10s
finish
3s
Annotations
6 errors
Test docs
Process completed with exit code 1.
|
Unit test (3.11)
Process completed with exit code 1.
|
Unit test (3.12)
The operation was canceled.
|
Unit test (3.12)
The strategy configuration was canceled because "test._3_11" failed
|
Unit test (3.13)
The operation was canceled.
|
Unit test (3.13)
The strategy configuration was canceled because "test._3_11" failed
|