chore(deps): update actions/checkout action to v5 #905
test.yaml
on: pull_request
Matrix: Unit test
Formatting check
1m 33s
Test docs
1m 27s
finish
5s
Annotations
5 errors
Unit test (3.12)
Process completed with exit code 1.
|
Unit test (3.11)
The operation was canceled.
|
Unit test (3.11)
The strategy configuration was canceled because "test._3_12" failed
|
Unit test (3.13)
The operation was canceled.
|
Unit test (3.13)
The strategy configuration was canceled because "test._3_12" failed
|