Skip to content

Support Monitor Client and Fetch Entity Metrics #401

Support Monitor Client and Fetch Entity Metrics

Support Monitor Client and Fetch Entity Metrics #401

Triggered via pull request July 10, 2025 20:28
Status Failure
Total duration 1m 0s
Artifacts

ci.yml

on: pull_request
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

10 errors
lint
Process completed with exit code 2.
build (3.13)
Process completed with exit code 255.
build (3.10)
The operation was canceled.
build (3.10)
The strategy configuration was canceled because "build._3_13" failed
build (3.9)
The operation was canceled.
build (3.9)
The strategy configuration was canceled because "build._3_13" failed
build (3.11)
The operation was canceled.
build (3.11)
The strategy configuration was canceled because "build._3_13" failed
build (3.12)
The operation was canceled.
build (3.12)
The strategy configuration was canceled because "build._3_13" failed