Skip to content

ci: update test workflow to send coverage to coveralls #403

ci: update test workflow to send coverage to coveralls

ci: update test workflow to send coverage to coveralls #403

Triggered via push June 17, 2025 17:17
Status Failure
Total duration 41s
Artifacts

ci-tests.yml

on: push
Matrix: build
coveralls
0s
coveralls
Fit to window
Zoom out
Zoom in

Annotations

9 errors
build (3.11)
Process completed with exit code 1.
build (3.13)
The operation was canceled.
build (3.13)
The strategy configuration was canceled because "build._3_11" failed
build (3.9)
The operation was canceled.
build (3.9)
The strategy configuration was canceled because "build._3_11" failed
build (3.12)
The operation was canceled.
build (3.12)
The strategy configuration was canceled because "build._3_11" failed
build (3.10)
The operation was canceled.
build (3.10)
The strategy configuration was canceled because "build._3_11" failed