331 combine extended procedures branches and test before merging to dev #124
Triggered via pull request
October 10, 2024 20:38
Status
Cancelled
Total duration
2m 53s
Artifacts
–
codeql.yml
on: pull_request
Matrix: Analyze Build_Internal
Matrix: Analyze Build_Minimal
Matrix: Analyze Build_RHEL
Matrix: Analyze Build_Wolf
Annotations
6 errors
Analyze Build_Wolf (c-cpp, manual)
Process completed with exit code 1.
|
Analyze Build_Internal (c-cpp, manual)
Process completed with exit code 1.
|
Analyze Build_RHEL (c-cpp, manual)
The run was canceled by @Donnie-Ice.
|
Analyze Build_RHEL (c-cpp, manual)
Process completed with exit code 1.
|
Analyze Build_Minimal (c-cpp, manual)
The run was canceled by @Donnie-Ice.
|
Analyze Build_Minimal (c-cpp, manual)
The operation was canceled.
|