Skip to content

Merge pull request #41 from kateengland-moore/fix-page-reload-error #68

Merge pull request #41 from kateengland-moore/fix-page-reload-error

Merge pull request #41 from kateengland-moore/fix-page-reload-error #68

Triggered via push April 16, 2025 10:45
Status Failure
Total duration 53s
Artifacts

run-tests.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

15 errors
P8.3 - L11.* - prefer-stable - ubuntu-latest
Process completed with exit code 2.
P8.2 - L11.* - prefer-stable - windows-latest
The operation was canceled.
P8.2 - L11.* - prefer-stable - windows-latest
The strategy configuration was canceled because "test.ubuntu-latest_8_3_11____2" failed
P8.2 - L11.* - prefer-lowest - windows-latest
The operation was canceled.
P8.2 - L11.* - prefer-lowest - windows-latest
The strategy configuration was canceled because "test.ubuntu-latest_8_3_11____2" failed
P8.3 - L11.* - prefer-lowest - windows-latest
The operation was canceled.
P8.3 - L11.* - prefer-lowest - windows-latest
The strategy configuration was canceled because "test.ubuntu-latest_8_3_11____2" failed
P8.3 - L11.* - prefer-stable - windows-latest
The operation was canceled.
P8.3 - L11.* - prefer-stable - windows-latest
The strategy configuration was canceled because "test.ubuntu-latest_8_3_11____2" failed
P8.2 - L11.* - prefer-stable - ubuntu-latest
The operation was canceled.
P8.2 - L11.* - prefer-stable - ubuntu-latest
The strategy configuration was canceled because "test.ubuntu-latest_8_3_11____2" failed
P8.2 - L11.* - prefer-lowest - ubuntu-latest
The operation was canceled.
P8.2 - L11.* - prefer-lowest - ubuntu-latest
The strategy configuration was canceled because "test.ubuntu-latest_8_3_11____2" failed
P8.3 - L11.* - prefer-lowest - ubuntu-latest
The operation was canceled.
P8.3 - L11.* - prefer-lowest - ubuntu-latest
The strategy configuration was canceled because "test.ubuntu-latest_8_3_11____2" failed