Skip to content

fix Updating GH workflows and setting ruff config #5

fix Updating GH workflows and setting ruff config

fix Updating GH workflows and setting ruff config #5

Triggered via push August 12, 2025 04:22
Status Failure
Total duration 14s
Artifacts

python.yaml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

9 errors
build (3.9)
Process completed with exit code 2.
build (3.10)
The operation was canceled.
build (3.10)
The strategy configuration was canceled because "build._3_9" failed
build (3.11)
The operation was canceled.
build (3.11)
The strategy configuration was canceled because "build._3_9" failed
build (3.13)
The operation was canceled.
build (3.13)
The strategy configuration was canceled because "build._3_9" failed
build (3.12)
The operation was canceled.
build (3.12)
The strategy configuration was canceled because "build._3_9" failed