Skip to content

perf(levm): improve ecpairing (bn128) #6310

perf(levm): improve ecpairing (bn128)

perf(levm): improve ecpairing (bn128) #6310

Triggered via pull request August 22, 2025 12:46
Status Cancelled
Total duration 16m 48s
Artifacts 2

pr-main_l2.yaml

on: pull_request
Matrix: integration-test
Integration Test - Based
4m 48s
Integration Test - Based
State Reconstruction Tests
4m 45s
State Reconstruction Tests
Integration Test
2s
Integration Test
Fit to window
Zoom out
Zoom in

Annotations

12 errors
Integration Test - Based
The operation was canceled.
Integration Test - Based
Canceling since a higher priority waiting request for L2 (without proving)-improve_ecpairing exists
State Reconstruction Tests
The operation was canceled.
State Reconstruction Tests
Canceling since a higher priority waiting request for L2 (without proving)-improve_ecpairing exists
Integration Test - Vanilla with Web3signer
The operation was canceled.
Integration Test - Vanilla with Web3signer
Canceling since a higher priority waiting request for L2 (without proving)-improve_ecpairing exists
Integration Test - Validium
The operation was canceled.
Integration Test - Validium
Canceling since a higher priority waiting request for L2 (without proving)-improve_ecpairing exists
Integration Test - Vanilla
The operation was canceled.
Integration Test - Vanilla
Canceling since a higher priority waiting request for L2 (without proving)-improve_ecpairing exists
Integration Test
Process completed with exit code 1.
L2 (without proving)
Canceling since a higher priority waiting request for L2 (without proving)-improve_ecpairing exists

Artifacts

Produced during runtime
Name Size Digest
ethrex_image
25.6 MB
sha256:31637132da1925e6986b278fcb8efad4f3ec2ca84b6f0592a2b53750af736d53
lambdaclass~ethrex~JUGCUY.dockerbuild
103 KB
sha256:631cb854eb7f6eb356d315d709f84afc16ac8530c05debad51e76d463ce2f015